Trigger rebuild

7 jobs for staging in 40 seconds (queued for 2 seconds)
latest
Status Job ID Name Coverage
  Build
failed #426581
build_docker_image

00:00:40

 
  Prepare Config Tests
skipped #426582
prepare_config_tests
 
  Test And Qa
skipped #426583
pylint
skipped #426584
unit_tests
 
  Prepare Config Staging
skipped #426585
prepare_config_staging
 
  Deploy To Staging
skipped #426586
deploy_to_staging
 
  Test Staging
skipped #426587
functional_tests_staging
 
Name Stage Failure
failed
build_docker_image Build
(4/6) Installing curl (7.61.1-r3)
(5/6) Installing oniguruma (6.9.4-r0)
(6/6) Installing jq (1.6_rc1-r1)
Executing busybox-1.28.4-r3.trigger
OK: 15 MiB in 25 packages
$ echo $DOCKERHUB_REGISTRY_PASSWORD | docker login -u $DOCKERHUB_REGISTRY_USER --password-stdin $DOCKERHUB_REGISTRY
Error: Cannot perform an interactive login from a non TTY device
Cleaning up file based variables
ERROR: Job failed: exit code 1