Created by: mkszuba
Manually patch the test databases from 90 to 98. This adds the patching from 97 to 98 to what has been submitted as #35 , however since the 90->97 commit had to be cherry-picked anyway I have squashed the whole change into a single commit.
Test databases in ensembl-test have been stuck at schema version 90 for quite a while now. Fully automated patching can only handle a single version bump at a time (which is why recent patcher runs ended up not doing anything to ensembl-test) so it became necessary to guide it all the way to 97.
Test-DB schema will finally be up to date.
Might reveal problems which stayed hidden due to having been stuck at 90. Advantage for the quality of our software but very much a drawback for one's peace of mind. That said, see below.
Have you added/modified unit tests to test the changes?
No.
If so, do the tests pass/fail?
N/A
Have you run the entire test suite and no regression was detected?
Yes, all tests still pass.